Agree what counts
Measure current time, cost, error, delay, vendor spend or capacity and define the verification method.
For selected automation and custom software projects, part of our compensation can be tied to recurring operational savings—reducing upfront commitment while keeping both sides focused on measurable value.
Adjust the assumptions to understand the possible cash-flow shape. This is a planning model—not a quote or guarantee. Actual terms require a verified baseline, delivery scope and agreed measurement method.
The project starts with evidence, not an optimistic ROI slide. Measurement rules and commercial boundaries are agreed before production delivery begins.
Measure current time, cost, error, delay, vendor spend or capacity and define the verification method.
A fractional CTO and senior engineers build, integrate, launch and support the production solution.
Review actual KPI movement transparently and apply the agreed share and total cap.
The current operating cost and measurement source are documented before work begins.
The variable portion follows savings observed through the agreed data—not projections alone.
A defined maximum prevents an open-ended obligation if value exceeds expectations.
Code and operational ownership can transition internally; dependency is not the business model.
These outcomes were not necessarily delivered under the same commercial structure; they demonstrate the kinds of measurable economics the model requires.
A unified internal platform reduced licensing, reconciliation and avoidable headcount.
Read the case study →A controlled digital workflow increased throughput without matching staff growth.
Read the case study →Reusable foundations and senior technical leadership changed project economics.
Read the case study →
Architecture, scope, adoption and KPI verification are led end-to-end by a senior CTO—not divided across sales, account management and outsourced delivery layers.
We agree the baseline, data source, calculation, exclusions and review cadence in advance. Sources may include payroll assumptions, system logs, cycle time, error rates, vendor invoices or infrastructure spend.
The variable payment follows verified savings under the agreed terms. Adoption, migration and operational change are planned explicitly because unused software cannot create savings.
Not necessarily. Most structures include a limited kickoff for analysis and a production milestone. The outcome-aligned portion reduces the amount funded independently of realized value.
No. It is a risk-aligned commercial structure built on jointly validated assumptions. Delivery, adoption and external business conditions can affect the realized outcome.
The agreed structure can include monitoring, fixes and incremental optimization during the savings-share period. Exact support boundaries are defined before delivery.
Yes. When scope is clear but recurring savings are hard to verify, a feature-level fixed-cost project is usually the cleaner model.
Bring one recurring operating cost, manual workflow or avoidable vendor expense. We’ll assess measurability, delivery feasibility and the right commercial structure.